In a distribution systems architecture such as Apache Mesos or DC/OS, it is often necessary to have a strategy for what to do if a node or task becomes unreachable. Unreachable in this sense means Mesos is unable to get status information about the task because it is no longer able to communicate to the agent. One strategy is to react slowly to the unreachable event assuming there is network issue (that doesn’t affect the users of the underlying service), or the task is a process that can run in isolation. Another strategy is to be more aggressive and assume recovery is needed.

In order for Marathon to provide partition aware unreachable strategy support there are 2 high level events that must occur:

  1. Mesos needs to communicate a task is unreachable
  2. Marathon must respond to that event if unresolved within a specified amount of time.

Each of these events have configuration options and DC/OS system defaults which are worth review in order to fully understand how and when an unreachable task will be managed by Marathon.

Apache Mesos Unreachable Strategies

Inactive Agent Logic and Unreachable Tasks

Marathon manages tasks not agents and is provided the status of TASK_UNREACHABLE for each task running on an agent marked as inactive due to health check failure. The sending of TASK_UNREACHABLE status by Mesos is controlled by 2 concepts:

  1. Mesos agent health checks.
  2. Agent rate limiter.

The notification to Marathon of a task becoming unreachable is based on an agent becoming inactive and can be delayed by the agent rate limiter.

Regarding agent health checks, the Mesos master flags of control are:

With the Mesos defaults, an agent will be marked inactive after a 75 seconds (15 seconds * 5) of no communication, assuming only 1 node becoming inactive.

In DC/OS, the default for --max_slave_ping_timeouts is 20 See dcos-config.yaml. As such, the Mesos master will consider an agent inactive after 5 minutes (20 * 15 seconds) of no communication. Again assuming only 1 node becoming inactive.

When Mesos marks an agent as inactive and the agent isn’t rate limited, Mesos will publish an unreachable task status update for all tasks associated with that agent. Where things can be surprising is when we consider the agent rate limiter.

Agent Removal Rate Limiter

In the previous section, we mentioned that Mesos will consider an agent inactive, assuming that only 1 agent is lost. This is because Apache Mesos has an agent rate limiter which was established prior to partition aware frameworks and is still enforced. The purpose of the rate limiter is to reduce the number of reported lost agents within a specified amount of time through the --agent_removal_rate_limit flag.

In Mesos, the default for --agent_removal_rate_limit is None, which has the effect of reporting agents immediately after the agent health check logic as described above.

The default in DC/OS however is 1/20mins See dcos-config.yaml which is 1 agent every 20 minutes. The following hypothetical timeline describes how 2 agents that become lost at the same time will be marked inactive:

The net result is that the amount of time that a agent on DC/OS can be lost or unreachable before Marathon is notified is not always deterministic. It is defined by the number of lost nodes, and the order in which they were lost 1. It is important to understand that these tasks are listed by Mesos as Active until this time and Marathon is completely unaware until notified by Mesos.

NOTE: There are 2 JIRAs against Mesos to remove rate limits. One marked as a critical bug (MESOS-7721) the other as a major improvement (MESOS-5948).

Marathon Unreachable Strategy

Marathon has configuration options for working with unreachable tasks by setting the unreachable strategy for a Marathon application as part as the app definition:

unreachableStrategy: {
  "inactiveAfterSeconds": 0,
  "expungeAfterSeconds": 0
}

In order for this to take effect it is necessary to get a TASK_UNREACHABLE status update from Apache Mesos. The above unreachableStrategy configuration for the app definition specifies how to respond to these TASK_UNREACHABLE events, as follows:

  1. inactiveAfterSeconds: the number of seconds Marathon will wait after receiving the TASK_UNREACHABLE status for a task to become reachable again. After this time Marathon will launch a replacement task.
  2. expungeAfterSeconds: the number of seconds after the TASK_UNREACHABLE task status update is received and only after a replacement task was launched (based on inactiveAfterSeconds expiration) that Marathon will kill the task when it becomes reachable again.

The expungeAfterSeconds must always be equal to or greater than inactiveAfterSeconds. The expunge event requires that the inactiveAfterSeconds event occurred first. The expunge time is a minimum time and only occurs after a replacement task has launched. If the original task becomes reachable after the inactiveAfterSeconds time but before the expungeAfterSeconds than Marathon will report 2 of 1 for the number of tasks running for that app. When the expungeAfterSeconds time expires the task will be killed. If the original task becomes reachable sometime after the expungeAfterSeconds time it will be killed immediately.

When the unreachable strategy is {0, 0}, the replacement is nearly immediate, with a replacement commonly occurring (for our test app) within roughly 3 seconds, and the expunge happening within 8-11 seconds. When we include this with the Mesos details described above for the loss of 1 agent, it means that Marathon will replace a task as soon as it is notified that the task is unreachable (which happens when the Mesos Master marks an agent as inactive), and it will expunge the original task as soon as it is reachable.

When time other than 0 is configured for the unreachable strategy, the Marathon task reconciliation event cycle is used to evaluate expiration times for unreachable tasks. The task reconciliation is a Marathon system configuration --reconciliation_interval. The Marathon defined default is 10 minutes. This means that an unreachable strategy which includes inactiveAfterSeconds = 60, will have a task replaced between 60 seconds and 11 minutes. For this example, the 60 seconds inactiveAfterSeconds could have just expired just before the reconciliation, thus launching a replacement task in ~ 60 seconds. Or the 60 seconds could expire immediately as a reconciliation window started needing to wait an additional 10 mins for the next reconciliation, thus replacement occurs ~ 11 mins after receiving unreachable status for the task. The reconciliation interval has the same effect on the expunging of a task.

DC/OS Unreachable Task Scenarios

The follow scenarios are given for a task going unreachable given a default configuration of a DC/OS cluster. This assumes that there are resources with required constraints available in the cluster for the replacement task. All marked time references are from the actual loss of an agent from the cluster.

Scenario 1: UnreachableStrategy {0, 0}, 1 agent becomes unresponsive for 4 minutes

At a task level, Marathon is not made aware that the agent was momentarily not responding; Mesos does not report the task as unreachable.

Scenario 2: UnreachableStrategy {0, 0}, 1 agent becomes unresponsive for 6 minutes

Scenario 3: UnreachableStrategy {0, 300}, lose 1 agent for 5 minutes; agent becomes reachable after 6 minutes of original event.

Note: The expunge time is 300 seconds which is 5 minutes. 5 minutes after Marathon was notified of the unreachable event is the 10 minute mark. It is possible that the reconciliation internal just happened prior to the 10 minute mark and the next time to expunge is the next reconciliation time which is at the 20 minute mark.

Scenario 4: UnreachableStrategy {0, 0}, Lose 4 nodes for hours, the task node is last.

Scenario 5: UnreachableStrategy {300, 300}, lose 4 nodes for hours, the task node is last.

Scenario 6: UnreachableStrategy {0, 0}, lose 1 node(no task) for 5 minutes and returns at 6 minute mark; lose task node for an undefined amount of time.

Note: Normally Marathon would get a TASK_UNREACHABLE status for an inactive agent in 5 mins. In this case, another agent went inactive and changed the notification time based on the agent rate limiter.

Scenario 7: UnreachableStrategy {86400, 86400}, Lose 1 node for 25 hours

Unreachable Summary

There are 3 windows of time when dealing with unreachable tasks. The first window is the time it takes Marathon to be notified of a task being unreachable. This is dependent on the number of health check failing nodes leading up to the event with a 5 minute minimum. When Marathon is notified it will respond within another window of time. A task replacement window starts with the inactiveAfterSeconds time which could be immediately and up to the reconciliation time window. The final window is expunging an unreachable task that has become reachable again. This window could be immediately upon the task becoming reachable if the expunge time has elapsed.

  1. This has been confirmed in a test where a 5 private agent cluster had a task on 1 agent. The processes on each node were shutdown with the node hosting the task being shutdown last. The amount of time that lapsed prior to Marathon receiving a TASK_UNREACHABLE status update was > 1.25 hours.